Add Flow Tests

  1. From the File menu, select the Hydrant Management option Hydrant Master Records option.
  2. If the Hydrant form is displayed, press New (or Ctrl + N) to add a new record.
  3. If the Query form is displayed, press Cancel to add a new record.
  4. Click the Flow Test tab.
  5. Press Add.
  6. Select Scheduled or Completed, then type the start date and time, and end date and time.
  7. Type or lookup the Staff ID of the member completing the inspection in the Inspector field.
  8. Complete a staff activity for the hydrant activity/repair record from the Hydrant Activity form Other section if you want to track staff time for the activity and associate the activity with staff records.
  9. Click the Flow Test tab.
  10. Type Measurements area values. Flow Calculation Results area values are automatically calculated. If Override Automatic Flow Calculations is checked, you can manually type a flow figure.
  11. Save and close when finished.

 

Related topics:

  • See NFPA 291 for additional information on hydrant flow testing